Skip to main content

Rig ANCO-04 

During the period from April 2024 to Aug 2024, Rig ANCO-04 is operated at Nafora Oil Field, the total operating hours counted to be ( 1657.0 hrs ), 1119.5 hr operation time that makes 67.56% of the total period, whereas 10.83% of the rig time was for moving from location to another, this rig serviced ( 5 wells ) in Nafora field with no significant down time, since it presented only 0.09% of the total operating time, 2 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 99.82%.

Rig ANCO-04 

During the period from April 2024 to Aug 2024, Rig ANCO-04 is operated at Nafora Oil Field, the total operating hours counted to be ( 1657.0 hrs ), 1119.5 hr operation time that makes 67.56% of the total period, whereas 10.83% of the rig time was for moving from location to another, this rig serviced ( 5 wells ) in Nafora field with no significant down time, since it presented only 0.09% of the total operating time, 2 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 99.82%.