Rig ANCO-07
During the period from July 2024 to Aug 2024, Rig ANCO-07 is operated at Nafora Oil Field, the total operating hours counted to be ( 669.0 hrs ), 338.0 hr operation time that makes 50.52% of the total period, whereas 5.53% of the rig time was for moving from location to another, this rig serviced ( 2 wells ) in Nafora field with no significant down time, since it presented only 1.35% of the total operating time, 9.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 98.67%.
Rig ANCO-07
During the period from July 2024 to Aug 2024, Rig ANCO-07 is operated at Nafora Oil Field, the total operating hours counted to be ( 669.0 hrs ), 338.0 hr operation time that makes 50.52% of the total period, whereas 5.53% of the rig time was for moving from location to another, this rig serviced ( 2 wells ) in Nafora field with no significant down time, since it presented only 1.35% of the total operating time, 9.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 98.67%.