Rig ANCO-02
During the period from Oct 2023 to Aug 2024 Rig ANCO-02 is operated at Nafora Oil Field, the total operating hours counted to be ( 3677.0 hrs ), 2451.5 hr operation time that makes 66.7% of the total period, whereas 6.1% of the rig time was for moving from location to another, this rig serviced ( 6 wells ) in Nafora field with no significant down time, since it presented only 0.8% of the total operating time, 22.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall
Rig ANCO-02
During the period from Oct 2023 to Aug 2024 Rig ANCO-02 is operated at Nafora Oil Field, the total operating hours counted to be ( 3677.0 hrs ), 2451.5 hr operation time that makes 66.7% of the total period, whereas 6.1% of the rig time was for moving from location to another, this rig serviced ( 6 wells ) in Nafora field with no significant down time, since it presented only 0.8% of the total operating time, 22.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall