Rig ANCO-05
During the period from March 2024 to Aug 2024, Rig ANCO-05 is operated at Nafora Oil Field, the total operating hours counted to be ( 2137.0 hrs ), 1575.5 hr operation time that makes 73.7% of the total period, whereas 8.68% of the rig time was for moving from location to another, this rig serviced ( 4 wells ) in Nafora field with no significant down time, since it presented only 0.66% of the total operating time, 32.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 99.35%.
Rig ANCO-05
During the period from March 2024 to Aug 2024, Rig ANCO-05 is operated at Nafora Oil Field, the total operating hours counted to be ( 2137.0 hrs ), 1575.5 hr operation time that makes 73.7% of the total period, whereas 8.68% of the rig time was for moving from location to another, this rig serviced ( 4 wells ) in Nafora field with no significant down time, since it presented only 0.66% of the total operating time, 32.5 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 99.35%.