Rig ANCO-06
During the period from March 2024 to Aug 2024, Rig ANCO-06 is operated at Nafora Oil Field, the total operating hours counted to be ( 2050.0 hrs ), 1408.5 hr operation time that makes 68.71% of the total period, whereas 7.44% of the rig time was for moving from location to another, this rig serviced ( 3 wells ) in Nafora field with no significant down time, since it presented only 0.76% of the total operating time, 48 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 98.51%.
Rig ANCO-06
During the period from March 2024 to Aug 2024, Rig ANCO-06 is operated at Nafora Oil Field, the total operating hours counted to be ( 2050.0 hrs ), 1408.5 hr operation time that makes 68.71% of the total period, whereas 7.44% of the rig time was for moving from location to another, this rig serviced ( 3 wells ) in Nafora field with no significant down time, since it presented only 0.76% of the total operating time, 48 hrs rig repair time, this figure can be considered as an excellent record, the rig overall efficiency was calculated is 98.51%.